MARINE CONSTRUCTION & OTHER PROJECTS
 
       
 

PASSENGER FERRY LANDING AT NORTH WILLIAMSBURG – NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION (NYCEDC)
Construction of a 35’ x 75’ barge anchored with four spud piles. Installation of two bowloader ramps and a gangway to the existing pier as well as installation of four monopoles with donut fenders.

16,000 TONS THROGS NECK ORTHOTROPIC BRIDGE
Fabrication for installation on the Throgs Neck Bridge, NYC. Delivery, via water, utilizing barges, handling 1200 panels weighting 38 tons each.

RIVERSIDE VIADUCT REHABILITATION
From 125th Street to 134th Street, New York City –NYSDOT Contract, Subcontract to American Bridge, Approx. 1800 tons, drilled and bolted connection.

TWO (2) TANK DIGESTER TANK COVERS
Approx. 40 tons each, 62’ diameter. One piece tank covers for Yonkers Sewage Treatment Plant, City of Yonkers, New York.

FOUR (4) FLOATING 1200 TON CONCRETE CAISSONS
Forming and pouring transformer vaults for installation at U.S. Naval Station, Staten Island, NY, Battleship Iowa. Poured at Steel Style Shipyard facilities, Newburgh, NY and floated into position.

CONSTRUCT BRIDGE & DEMOLISH NEWBURGH TUNNEL & RELATED WORK
Newburgh, NY, Consolidated Rail Corporation. A high profile Conrail pile driven, welded bridge construction including the demolition of a 500’ active main line rail tunnel.

FIFTY-FOUR (54) SEMI-PORTABLE 20’ VANDAL PROOF, ALL STEEL MINI POOLS
New York City Department of Parks, Recreation, and Cultural Affairs. Corona Park, NY

PONTOON LAUNCHER
Trident Submarine Launch Facility, Groton, CT. Fabricated for General Dynamics Corp., Electric Boat Division. Vessel weighing approximately 6,000 tons, measures 100’W x 500’L.

FLOATING CAISSON GATE
Trident Submarine Launch Facility, Groton, CT. Fabricated for Morrison- Knudsen Co., the prime contractor and General Dynamics Corp. Electric Boat Division.

FOUR (4) STEEL CAISSONS
66’W x 107’L x 175’H - For the second Newburgh-Beacon Bridge, fabricated for the Joint Venture of Steers-Spearin-Yonkers-Buckely, the prime contractor.

DRYDOCK CAISSON GATES- FOR THE FOLLOWING U.S. NAVY SHIPYARDS
• Drydock No. 1 Caisson Gate, Charleston Naval Shipyard, Charleston, SC,
• Drydock No. 4 Caisson Gate, Norfolk Naval Shipyard, Portsmouth, VA.
• Drydock No. 1 Caisson Gate, Pearl Harbor Naval Shipyard, Pearl Harbor, Hawaii.

NEW YORK CITY DEPARTMENT OF SANITATION BARGE
Clean Water II, Freshkills Marine Unloading Plant # 1, Freshkills, Staten Island.

TWO CRANE BARGES
65’W x 120’L x10’H and 65’W x 160’L x 12’H - For Weeks Stevedoring Company, Inc. 216 North Avenue East, Cranford, NJ 07016.

ELEVEN (11) COVERED LIGHTERS
(YFN) and two (2) Open Lighters (YC) (32’W x 110’L x 9’H) for Naval Sea Systems Command, Washington, D.C.

STEEL ROOF TRUSS AND PLATE COVER
For two (2) 36 million gallon Liquified Natural Gas Tanks, 135’ high x 283’ diameter, fabricated and erected for Walsh Construction Co., 711 Third Avenue, New York, NY. The tanks represent the largest of their type ever constructed.

CONSTRUCT WALERS, CHANNEL CAPS, HANDRAILS AND RELATED PARTS
For the reconstruction of the Cold Spring Dock, in Cold Spring, NY (a portion of the Corps of Engineers Superfund cleanup of the marathon Battery site), International Technology Corporation.

MAINTENANCE DREDGING AND RELATED WORK
Norrie Point Marina, M.L. Norrie State Park, Staatsburg, NY. Dredge marina harbor and other related work, 12,850 cubic yards of material, New York Office of Parks Recreation and Historic Preservation.

DREDGING OF HAZARDOUS MATERIALS
Marathon Battery Superfund Site, Cold Spring, NY- Dredge 2,200 cubic yards of contaminated material at the Cold Spring Dock, Sevenson Environmental Services, Inc.

121’ X 40’ 12’ STEEL PONTOON FOR THE CHILDREN’S MUSEUM BOSTON, MA
A steel pontoon, 130 tons, to support a three story floating museum. General Contractor: Barr & Barr, Inc.

 

*Some projects were completed under Steel Style, Inc., a former related party.

 
 
   
           